Insights

Guides and analysis on workholding, parts per shift and production milling from the PAWS Workholding engineering team.


The Hidden Opportunity in Workholding: Parts Per Shift

Feed time averages 40-50% of run time. A guide to the non-cutting half: load time, tool changes, part density and the fixture math behind parts per shift.


Contact A Workholding Specialist

Questions? Contact us to speak with an engineer regarding your workholding application.

(866) 686-7297